Installation Qualification

MFDA can assist you in developing a Facility Installation Qualification protocol 
tailored to your specific facility requirements.  
The contents of a typical procedure may include, among others, the following 
sections:

  1. Protocol Approval Page

  2. Table of Contents

  3. Purpose

  4. Scope

  5. Responsibilities

  6. Facility Description

    1. Room Description

    2. Room Numbers

    3. Classifications

  7. References (Drawings, etc.)

  8. Standard Operating Procedures

  9. Instrument Calibration Review

  10. Facility Room Inspection Check List (materials of construction and finishes)

  11. Room Inspection Testing

    1. Noise Levels

    2. Light Intensity Levels

  12. Drawing Reviews

  13. Acceptance Criteria Summary

  14. Protocol Summary Report

  15. Protocol Deviations and Corrective Actions

  16. Protocol Document Requirements (Attachments)