Operational Qualification

MFDA can assist you in developing an OQ utility validation 
protocols tailored to your specific utility system.
The contents of a typical procedure may include, among 
others, the following sections:

  1. Protocol Approval Page

  2. Table of Contents

  3. Purpose

  4. Scope

  5. Responsibilities

  6. System Description

    1. Major Component Parts

    2. Water Flow Path Through System

    3. Alarms and Controls

  7.  References (Drawings, etc.)

  8. Standard Operating Procedures

  9. Instrument Calibration Review

    1. Test Instruments

    2. Process-Related Instruments

  10. Listing of Key Operating Parameters

  11. Functional Testing of Key Operating Parameters

  12. Acceptance Criteria Summary

  13. Protocol Summary Report

  14. Protocol Deviations and Corrective Actions

  15. Protocol Document Requirements (Attachments)